Item Id: |
Code of the item which one wants to examine and modify the .BOMs. |
Type: |
Select, in the dropdown list, the bill of material type. |
Variant: |
The active BOM (the one which is selected on the Item window, Routing tab) is noted by the * sign. The bills of material already recorded (which have links) are noted with the + sign. |
Reference Date: |
This date is used to select the active links when the lists are displayed. |
Maintenance |
Displays the Product Structure Record Maintenance window. |
Graphs |
Displays the graphic representation of the multi level bill of material |
Duplicate |
Lets you duplicate the bill of material variant of the selected item for another item. You enter the code of the item on which you want to affect the bill of material. See Bills of Material Duplication. |
Replace |
Lets you replace the selected item for all its uses and for the selected bill of material. See Mass Replacement of a component. |
Compare |
Lets you compare two bills of material. See Bills of Material Comparison. |
Delete |
Deletes all the products structure records of the bill of material. After execution of this function the item will not have any product structure record any more in the selected bill of material. |
Single Level BOM |
Displays the first level product structure records list (or Single Level Bill of Material) valid on the reference date. |
Multi Level BOM |
Displays the Multi Level Bill of Material on the reference date. |
Summarized BOM |
Displays the Summarized Bill of Material on the reference date. |
Purchasing BOM |
Displays the Purchase Bill of Material on the reference date. |
Single level Where-used |
Displays the list of the single level where-used of the item on the reference date. |
Multi level Where-used |
Displays the list of the multi level where-used on the reference date. |
Cumulative Where-used |
Displays the top level items which use the item as
well as the total usage coefficient for each of them (Cumulative
Where-used). |
Work Loads |
|