Some orders cannot be scheduled for the following reasons:
• their due date is after the given deadline,
• in the forward schedule case: it is not possible to schedule all the operations before the given deadline because of the required manufacturing times,
• in the backward schedule case: it is not possible to place all the operations after the starting date of the scheduling.
This list displays the non-scheduled planned orders and the relevant cause of non-scheduling.