The Non-scheduled Work Order list option shows the list of released or firm work orders that could not be scheduled by the Finite Capacity Scheduling function (Scheduling menu). A work order can be impossible to schedule when its due date is outside the scheduling horizon or when some congestion effect induces such waiting times that it is impossible to load all the operations in the scheduling horizon.