Planning Groups

The MRP calculation can be limited to some planning groups with the dropdown lists Start Group and End Group.

For example, it is thus possible to fix the production plan for the group 0 (finished goods) and then perform a net requirements calculation for the group 1 and so on up/to group 9 (which corresponds to the purchased items).