The production planning procedure is performed in many successive steps:
• Definition of the items management parameters in the Item window. These parameters define how the size of each purchase or each work order is calculated,
• Entry of the sales forecasts for all the products that are sold by the company (finished goods, spare parts, and so on…)
• Entry of the firm sales orders,
• Possibly, definition of the Sales and Operations Plans and conversion of these production plans into production requirements for the manufactured items,
• Calculation of the net requirements, via the Material Requirements Planning function, which suggests Production Orders (Work Orders) and Purchase Requisitions,
• Order scheduling and work load calculation, via the Infinite Capacity Scheduling function,
• Analysis of the work loads issued from the planned orders, via the work loads profile function,
• Analysis of the slack of the planned orders, via the Planned W.O. Slacks function,
• Examination and possible modification of the planned work orders by the MRP procedure,
• Conversion of the planned work orders into firm orders, via the Planned to Firm W.O. Conversion function,
• Examination and possible modification of the Planned Purchase Requisitions,
• Conversion of the Planned purchase requisitions into Firm Purchase Requisitions via the Planned to Firm P.R. Conversion (see the Purchasing menu),
• Entry of the Purchase Orders of raw materials and components to the vendors,
• If needed, finite capacity scheduling of the firm work orders (see the Detailed Scheduling chapter),
• Release of the work orders (see the Detailed scheduling chapter),
• Production activity control of the work orders using the production reporting transactions (see the Production Activity Control chapter),
• Work order closing.