The entry of production reports is done either by the Production Reporting option of the Control menu, or by the Reporting button on the Operations in progress page, or by the Reporting button of the Work Center Queue page.
The Tables button permits the user to create the useful entries in the different tables that are required for the production reporting process.
Transaction date: |
Date on which the operation was finished. The current date is proposed by default. The transaction date cannot be later than the current date. |
Operator #: |
|
Activity: |
|
W.O. #: |
W.O. number for which the transaction is to be
made. |
Operation #: |
Operation number of the W.O. for which the transaction
is about to be made. |
Machine #: |
The machine code of which the operation was performed (for the machines of type F and M only). |
Quantity good: |
The accepted quantity is entered (since the last transaction). |
Quantity rejected: |
|
Reject reason: |
|
Machine hours used: |
|
Labor hours used: |
|
Comment: |
An open comment on how the operation progressed. |
If the quantity accepted and the rejected quantity is equal to the quantity to process, then the operation is declared closed.
When the last operation in a W.O. is closed, the W.O. status converts into Completed.
The Update checkbox authorizes the receipt of negative quantities and times to update previous erroneous transactions.