The window for a subcontracting work center is different from that of the other types of work center:
• you must enter a subcontractor code which is a vendor; it has to be defined previously in the vendor table,
• you must enter a standard and a simulated hourly rate for the subcontracting operations. The cost of a subcontracting operation is equal to the operation time multiplied by one of those rates.
• The Workshop field can be used to regroup several subcontractors.