Time Used Analysis

This table which one reaches by the Time used analysis option of the Control menu presents an analysis by Work center of the times used compared to standard times.

One finds there successively the mean algebraic deviation and the mean absolute deviation of machine times and labor times expressed as a percentage of standard times.

The differences between the operation times defined in the operation routings and the real used times can be displayed by clicking on the OK button.