Worker Activity Analysis

This graph presents for the selected operator the breakdown of its times (as entered on the Production reporting page) by type of activity. If the working time excluded box is checked, the graph includes only unproductive times.

The total of time is carried out over the past days, weeks or months until the current period. One indicates the number of past periods over which one wants to make the total.

This analysis can also be presented expressed as a percentage.