Bill of Material Types

According to the requirements of every user category it may be useful to describe several decompositions for a same item. In this way, you will be able to describe several decompositions:

      according to the manufacturing or assembly process (M),

      functional for the engineering department (E),

      nVC frozen to the date of establishment of the budget (B).

The MRP calculation procedure uses the manufacturing bills of material (M).

The engineering bills of material (E) let you define a functional decomposition of the products and not a decomposition according to the manufacturing process.

The Frozen bills of material (B) are bills of material set at the budget date (for instance, January the 1st). They are established by selection of the product structure records of the manufacturing bill of material at a date specified by the Frozen Data Creation function. You cannot modify them.