Infinite Capacity Scheduling Chart

After the scheduling process, the scheduling chart displays the time position of the work order.

It is possible to choose the category of displayed orders, namely either the planned work order, or the firm work order only, or both.

It is possible to choose the schedule which is displayed: either the schedule corresponding to the release and due dates, or the dates calculated with forward scheduling or backward scheduling.

If one selects the Forward or Backward Dates options, a yellow line represents the margin of each order and a red line represents the eventual delay of each order (if the order time length exceeds the time period between the release date and the due date.

For each firm work order, the date of each operation is displayed by checking the “Display Operations” box.