Link Id: |
Obligatory field (3 numeric characters). |
Component Id: |
Code of the component item (obligatory). |
Quantity Required: |
Ratio defined as the Quantity of the component over the quantity of parent item indicated in the next field. |
/ Parent Quantity: |
|
Fixed scrap: |
|
Proproportionnal. scrap: |
This information is used in the MRP calculation to determine the required quantity of the component. |
Offset: |
|
Operation Id: |
This number is used if the manufacturing lead time is calculated from routings and if components are linked to each operation (see Advanced Planning Options, Planning chapter). |
Start Date: |
|
End Date: |
The program displays the state of the link (if it is active or not) relative to the reference date indicated on the previous window. |
Comment: |
Optional field. |