This window presents a summary of the loads or capacity utilization for all the managed entities (work centers, workshops, cost centers, labor qualifications, or tools) which can be selected in the drop-down list (Sum by...).
One also chooses the time horizon for which the loads are cumulated (days, weeks, months) as well as the number of periods. When clicking on the All button, the time limits are automatically equal to start and end scheduling dates.
One can post either the totals or the details by type of order.