Resource Capacity Utilization

This function displays a graph of resource utilization for the different work centers. These graphs distinguish the unavailability time, the time taken by the setups, the execution time and the idle time. The used unit can be chosen as values or percentage. One chooses the horizon of this analysis by specifying the type of period and the number of periods.

One can also obtain the same analysis for the labor qualifications by selecting the loads per qualification. This is possible for the qualifications stated as critical (see Qualification maintenance page).

The Table button displays a summary list of the occupation of each work center on the specified scheduling horizon.