This graph which one reaches by the Activity time used option of the Control menu presents for the selected Work center the distribution of the times used for the machines or the labor (indicated on the Production Reporting page) by type of activity. If the working time excluded box is checked, the graph shows only the analysis of unproductive times.
The unused Work center capacity is also posted in last line.
One retains only the activities whose codes are between 00 and 89 because the activities numbered between 90 and 99 are used to record unproductive labor times not related to any Work center.
The total of times is carried out over days, weeks or months up to the current period. One indicates the number of past periods over which one wants to calculate the total.
This analysis can also be presented expressed as a percentage.