This graph shows the machine or labor work load corresponding to the finite capacity scheduling.
Firstly, it is possible to select a work center, a cost center, a workshop, a labor qualification or a tool.
Then, one has to choose the type of information to display:
• Loads, which includes the set-up and processing times,
• Capacity Utilization,
• Capacity, which shows the daily capacities and the downtime of machines.
The number of weeks to display can also be chosen (between one and five). The Weeks option displays the results for the whole scheduling horizon.
It is worth noting that the Capacity utilization, by definition, is always less or equal to one.