Work Order Component Issue

In order to manufacture, the parts must be released from inventory. The part release page displays, for a selected W.O., the parts requirements. It allows inventory items to be issued, if they are reserved it transforms them into WIP.

At the bottom of the page, appears the list of required parts, the required quantity according to the specified item quantity, reserved quantity and the quantity already released.

To avoid having to declare many component issues, one can activate the component back flushing for the manufactured item (Routings tab). A message appears then on the page. One cannot enter a quantity issued.

If component back flushing is activated, one can nevertheless carry out additional issues by the Line Issue function.

Fields

Transaction date:

The current date is proposed.

Open W.O. Id:

W.O. number that is required.
The manufactured item and the W.O. quantity are shown.

Quantity prepared:

Allows indicating the product quantity to manufacture. When this field is completed, finished or left, the part requirements are automatically recalculated.

Buttons

Apart from the standard buttons, this page has three buttons:

Update

Compute the material/components requirements corresponding to the quantity entered in the cell Issued quantity. The requirements are displayed in the Required column.

OK

This button realizes the automatic components issue (if the option Automatic components issue is selected).

Line Issue

Shows the line issue page.

The automatic release performs the releases within the limits of the reserved inventory. If, for example, scrap parts were made, it is necessary to manually move available inventory by transferring it from available inventory to reserved inventory (RESV status). If the quantity of a part is lacking, the system warns that it can perform the releases only within the limits of reserved inventory.

 If, for the item, the operations for which each component is necessary have been defined in the BOM links (see the Product Structure Record maintenance page), then these operations are displayed (with the corresponding Work center).