Finite Capacity Scheduling

Finite capacity scheduling plans the operations on the machines, in order to produce a detailed job schedule.

Several scheduling methods are proposed, as forward or backward scheduling, or priority rules.

Before starting the scheduling procedure, machine calendars have to be up to date and the possible downtimes of the machine (that need maintenance or could break down) have to be entered.